赣江象山枢纽闸门调度模型试验研究

Experimental Study on the Sluices Operation Model of Xiangshan Hydro-junction of Ganjiang River

  • 摘要: 针对枢纽泄流能力、枢纽不具备通航、过鱼、下游防冲的适宜流速等问题,对象山枢纽闸门调度进行模型试验,验证枢纽泄流能力,分析不同流量、不同调度方式下枢纽上下游的水流特征。试验结果表明:17孔泄水闸全开状况下枢纽泄流能力满足设计要求;Ⅰ区、Ⅲ区闸门单独启用会导致该侧下游河道流速偏大,不利于通航和下游的防冲,建议Ⅰ区、Ⅲ区闸门联合调度,不同工况下满足众多需求的方案有方案五、七、九、十二。合理的闸门调度方案不仅能够降低水流对下游河床的冲刷,减小水流对船闸通航的影响,而且能减少闸门开启数量,节省运行成本,延长工程的寿命。

     

    Abstract: In view of the sluice discharge capacity of the hub and the lack of suitable flow velocity for navigation, overflow and downstream anti-flooding, this paper conducted physical model tests for sluice dispatch of Xiangshan Hub to verify the sluice discharge capacity of the hub, analyzed the upstream and downstream flow characteristics of the hub under different flow rates and different scheduling modes, and proposed a reasonable and feasible sluice operation scheme to provide technical support for the later special scheduling test research. The test results show that the discharge capacity of the hub could meet the designed requirements when the 17-hole sluice gate is fully open. The single use of gate in Zone Ⅰ and Zone Ⅲ will cause the downstream river flow rate of the side to be too large, which is not conducive to navigation and flood prevention downstream, it is recommended that the joint operation of gate in Zone Ⅰ and Zone Ⅲ, which can meet many needs under different working conditions are plan 5, 7, 9 and 12. Reasonable gate scheduling scheme can not only reduce the erosion of water flow to the downstream river bed, reduce the influence of water flow on the navigation of the lock, but also reduce the number of gate opening, save the operating cost, and extend the life of the project.

     

/

返回文章
返回