高级检索+

基于系统动力学模型的高原喀斯特山区水资源承载力评估及模拟

Evaluation and Simulation of Water Resources Carrying Capacity in Plateau Karst Areas Based on System Dynamics Model

  • 摘要: 为实现人水和谐及经济社会的可持续发展,研究区域水资源承载力具有重要意义。基于系统动力学模型,结合区域水资源系统特性设计了水资源承载力评估模型(Water Resources Carrying Capacity Evaluation Model based on the System Dynamics Model, WRCC-SEM),包括经济社会模块、水资源压力模块、水资源支持力模块、水资源承压分析及承载力计算模块4个子模块。以遵义市主城区为研究区,构建了遵义市主城区WRCC-SEM模型,并以研究区统计数据对模型进行真实性检验,进而对遵义市主城区未来水资源承载力进行评估及分析。结果显示,模型2015-2019年模拟值与相应的统计值基本接近,各年相对误差绝对值均低于15%,证明了模型结构的合理性及模拟的有效性;从水资源潜在的承载力来看,遵义市主城区水资源量可支持经济社会的发展;从工程可供水量的角度,2020-2035年期间,遵义市主城区包括2035年在内的部分年份由于工程性缺水,水资源承压关系为超载,经济社会发展将受限。为提高区域水资源承载力及协调水资源与经济社会发展之间的关系,管理者需合理布局水源工程规模及投产时序。

     

    Abstract: In order to achieve harmony between human and water and sustainable economic and social development,this paper designs a water resources carrying capacity evaluation model based on the system dynamics model(WRCC-SEM),including economic and social modules,water resources pressure modules,water resources supporting capacity modules,water resources pressure analysis & carrying capacity calculation module. Taking the main urban area of Zunyi City as the study area,the WRCC-SEM model of the main urban area of Zunyi City is constructed,and the authenticity of the model is verified with the statistical data of the study area,and then the future water resources carrying capacity of the main urban area of Zunyi City is evaluated and analyzed. The results show that the model simulation values are basically close to the corresponding statistical values in 2015 to 2019,the absolute relative errors are less than 15% in each year,which proves the rationality of the model structure and the effectiveness of the simulation. From the perspective of the potential carrying capacity of water resources,the amount of water resources in the main urban area of Zunyi City can support economic and social development. However,from the perspective of engineering water supply,from 2020 to 2035,due to engineering water shortages,the pressure relationship of water resources is overload in some years,including the year 2035,the main urban area of Zunyi City will be limited in economic and social development. In order to increase the carrying capacity of regional water resources and coordinate the relationship between water resources and economic and social development,the managers need rationally arrange the scale of water source projects and the timing of their commissioning.

     

/

返回文章
返回