高级检索+

江西省工程性缺水突出短板和对策研究

Engineering Water Shortage in Jiangxi Province Outstanding Short Board and Countermeasures Research

  • 摘要: 江西省水资源丰富,但降水时空分布不均、水旱灾害多发。受水资源时空分布不均、江河来水调配能力不足、鄱阳湖低枯水位等因素影响,江西省工程性缺水问题日益突出。通过对江西省水资源时空分布、水资源开发利用、水资源配置体系、城乡供水安全保障能力、水文情势变化、生态保护修复等方面分析全省工程性缺水突出短板成因,以问题为导向,研究提出加强解决工程性缺水问题项目建设、推进提升全域水生态环境质量效益项目建设、推进水资源节约集约利用、提升用水效率水平等发展对策,对解决江西省工程性缺水突出短板提供了一定的指导意义。

     

    Abstract: Jiangxi is rich in water resources,but the spatial and temporal distribution of precipitation is uneven,and floods and droughts are frequent. Affected by the uneven spatial and temporal distribution of water resources,the insufficient allocation of river water and the low and dry water level of Poyang Lake,the engineering water shortage problem in Jiangxi Province is becoming increasingly prominent. Through time and space distribution of water resources,water resources development and utilization in Jiangxi Province,the water resources allocation system,urban and rural water supply security ability,change of hydrology,protection and restoration of the ecological analysis of the provincial physical cause outstanding short board,water shortage problem oriented,this paper studies the construction of resolving water shortage problems physical project,promotes the global water ecological environment quality,project construction,promotes the economical and intensive utilization of water resources development countermeasures,and enhances the level of water use efficiency. Solving the engineering water shortage in Jiangxi Province provides certain guiding significance.

     

/

返回文章
返回