摘要: 为了解决围堰施工进度和料场征地移民进度之间的矛盾,在邕宁水利枢纽工程施工阶段提出了一期枯水围堰设计方案的替代结构型式,并利用施工仿真、技术经济分析方法对围堰型式进行了优选;采用三维数值模拟和物理模型试验方法研究了束窄河床水力特性,结果表明,当纵堰轴线布置在坝体7号至8号闸墩之间时,能够解决施工期通航和围堰防冲问题。研究结果为本工程一期枯水围堰施工提供了重要依据,对于保证工程施工进度起到了决定性作用。Abstract: To solve the contradiction between the cofferdam construction progress and the material land requisition and resettlement,the alternative solutions of the designed scheme is proposed during the construction of Yongning water control project 1 st stage cofferdam of the dry season,optimized by construction simulation,technical and economic analysis methods. The hydraulic characteristics of the narrowed riverbed are investigated by 3 D-numerical simulation and physical model test methods. The results show that when the axis is arranged between7# and 8# gate pier of the dam body,the problem of navigation and scour prevention for the cofferdam can be resolved. The results provide an important basis for the construction of the 1 st stage cofferdam of the dry season,thus decisively ensuring the construction progress of this project.
-
-
[1] 李建军.向家坝水电站施工导流方案研究[J].人民长江,2015,46(2):71-75. [2] 张毅驰,彭继乐,林国辉.枕头坝一级水电站分期施工导流设计及优化[J].水力发电,2015,41(8):66-69. [3] JOHNSON M C,SAVAGE B M. Physical and numerical comparison of flow over ogee spillway in the presence of tailwater[J]. Journal of Hydraulic Engineering,2006,132(12):1 353-1 357.
[4] XIE JB,AI YP,ZHANG WX,et al. Hydraulic model test on diversion structures of Gongguoqiao hydropower station during construction[J]. Procedia Engineering,2012,31(1):44-50.
[5] CHINNARASRI C,KOSITGITTIWONG D,JULIEN P Y. Model of flow over spillways by computational fluid dynamics[J]. Proceedings of the ICE-Water Management,2013,167(3):164-175.
[6] 胡晓清,钱忠东,槐文信,等.阶梯溢流坝水流特性数值模拟[J].武汉大学学报(工学版),2008,41(4):20-23. [7] 杜金威,王均星,李辉成.阳升观台阶溢洪道水流数值模拟研究[J].武汉大学学报(工学版),2020,53(2):110-116. [8] 戴会超,杨文俊.三峡工程明渠导流通航及数值实验研究概述[J].水力发电,2004,30(7):17-19. [9] 梁日新,高仪生.枕头坝导流明渠子围堰防渗抗冲设计与施工[J].人民长江,2012,43(14):67-69. [10] 彭杨,张红武.分期导流围堰束窄河床二维水流特性模拟及分析[J].水力发电学报,2013,32(4):71-76. [11] 贺昌海,陈辉,刘全.基于CATIA建模的导流工程三维数值模拟研究[J].天津大学学报(自然科学与工程技术版),2016,49(4):422-428. [12] 李瑛,林楚凌,惠建伟,等.邕宁水利枢纽一期临时土石围堰施工仿真及BIM可视化[J].中国农村水利水电,2020(5):92-97,102.